Description
Diagonal DD CCA with intergrated latch to make the ALU effectively 3t *in a pipeline*.
3t + 1t latch
16-bit
ALUified
Related Schematics

Skyscraper (unfinished) with elevator to bedrock for mining access
A bit of a project im working on for a base with easy access to bedrock level for mining, I will finish the skyscraper soon and add different ways to access upper mining levels
Sep 17, 2025
↵
select
↑↓
navigate
esc
close
5 results
1 plugins loaded